Permits

  1. CFRC Information Summary and Contact Information
    1. This is a summary of information related to the permitting process, and a summary of specific contact information
     

  2. Safety and Security clearances
    1. This is a summary of contact information for safety and security clearances
     

  3. General Use Permits
    1. CFRC Right of Entry
      1. This permit is for conducting any activity within/on CFRC property including:
        • Right of Entry for temporary purpose only including the following activities:
          • Surveys
          • Environmental Investigations
          • Ingress/Egress (short-term)
          • Inspection (bridges, roads, etc.)
          • Monitoring wells
          • Soil boring or sampling
          • Oversized equipment moving over operating track and/or right-of-way
          • Environmental Remediation
        • Right of Entry for scheduling approved activities within/on CFRC right-of-way that are covered by an existing agreement or permit. Work activities include:
          • Minor inspection/maintenance activities
          • Replacement of an existing facility with like kind.
     

  4. Utility Permits
    1. CFRC Underground Installation (Pipelines)
      1. This permit is for conducting any underground activity within/on CFRC property including:
        • New pipeline installation crossing or longitudinal to CFRC tracks
        • Upgrade/modification to existing pipeline crossing or longitudinal to CFRC tracks that is not covered by an executed permit.
       

    2. CFRC Overhead Installation (wirelines)
      1. This permit is for conducting any underground activity within/on CFRC property including:
        • New overhead wireline installation crossing or longitudinal to CFRC tracks
        • Upgrade/modification to existing wireline crossing or longitudinal to CFRC tracks
       

    3. CFRC Tower Installation
      1. This permit is for conducting any activity associated with a communication tower located within/on CFRC right-of-way including:
        • New tower installations
        • Upgrade/modification to existing facilities
       

  5. Overhead Structure/Bridge Permits
      1. CFRC Overhead Structure/Bridge
        1. This process is for obtaining a Lease Agreement to construct and/or maintain any bridge or structure over the CFRC right-of-way including:
          • New overhead highway or pedestrian bridges crossing or parallel to CFRC tracks
          • Upgrade/modification/demolition to existing overhead bridges crossing or parallel to CFRC tracks
          • Other structures
          • Upgrade/modification to existing CFRC grade crossing
     

  6. Leasing/Other
    1. CFRC Leasing and Other Uses
      1. This process is for information about surplus property, leasing and other corridor uses not covered by the items above