Project Documents
- Transmittal Letter 08.24.09
- HSIPR Application - Track 1a 08.24.09
- Attachment F 08.24.09
- Attachment G - Maps of the Planned Investment 08.24.09
- DBM Concept Plans - 1 08.24.09
- DBM Concept Plans - 2 08.24.09
- DBM Concept Plans - 3 08.24.09
- DBM Concept Plans - 4 08.24.09
- DBM Concept Plans - 5 08.24.09
- DBM Concept Plans - 6 08.24.09
- DBM Concept Plans 6a 08.24.09
- DBM Concept Plans - 7 08.24.09
- DBM Concept Plans - 7a 08.24.09
- DBM Concept Plans - 8 08.24.09
- DBM Concept Plans - 9 08.24.09
- DBM Concept Plans - 10 08.24.09
- DBM Concept Plans - 10a 08.24.09
- DBM Concept Plans - 11a 08.24.09
- DBM Division I Specifications 08.24.09
- DBM Scope Changes 08.24.09
- Signal Charts - 1 08.24.09
- Signal Charts - 2 08.24.09
- Signal Charts - 5 08.24.09
- Design Criteria 08.24.09
- DBB 100% Station Design Contract Plans 1 08.24.09
- DBB 100% Station Design Contract Plans 2 08.24.09
- DBB 100% Station Design Contract Plans 2A 08.24.09
- DBB 100% Station Design Contract Plans 3 08.24.09
- DBB 100% Station Design Contract Plans 4 08.24.09
- DBB 100% Station Design Contract Plans 5 08.24.09
- DBB 100% Station Design Contract Plans 5a 08.24.09
- DBB 100% Station Design Contract Plans 5b 08.24.09
- DBB 100% Station Design Contract Plans 5c 08.24.09
- DBB 100% Station Design Contract Plans 5d 08.24.09
- DBB 100% Station Design Contract Plans - DeBary A 08.24.09
- DBB 100% Station Design Contract Plans DeBary B 08.24.09
- DBB 100% Station Design Contract Plans Sanford Station A 08.24.09
- DBB 100% Station Design Contract Plans Sanford Station B 08.24.09
- DBB 100% Station Design Contract Plans Lake Mary A 08.24.09
- DBB 100% Station Design Contract Plans Lake Mary B 08.24.09
- DBB 100% Station Design Contract Plans Longwood A 08.24.09
- DBB 100% Station Design Contract Plans Longwood B 08.24.09
- DBB 100% Station Design Contract Plans Longwood C 08.24.09
- DBB 100% Station Design Contract Plans Altamonte Springs A 08.24.09
- DBB 100% Station Design Contract Plans Altamonte Springs B 08.24.09
- DBB 100% Station Design Contract Plans Maitland Station 08.24.09
- DBB 100% Station Design Contract Plans Winter Park 08.24.09
- DBB 100% Station Design Contract Plans Florida Hospital 08.24.09
- DBB 100% Station Design Contract Plans Lynx Central Station 08.24.09
- DBB 100% Station Design Contract Plans Church Street Station 08.24.09
- DBB 100% Station Design Contract Plans Sand Lake Road A 08.24.09
- DBB 100% Station Design Contract Plans Sand Lake Road B 08.24.09
- DBB 100% Technical Special Provisions - 1 08.24.09
- DBB 100% Technical Special Provisions - 2 08.24.09
- DBB 100% Technical Special Provisions - 3 08.24.09
- DBB 100% Technical Special Provisions - 4 08.24.09
- DBB 100% Technical Special Provisions - 5 08.24.09
- DBB 100% Technical Special Provisions - 6 08.24.09
- DBB 100% Technical Special Provisions - 7 08.24.09
- DBB 100% Technical Special Provisions - 8 08.24.09
- Project Management Plan 08.24.09
- Intercity Rail Vision Plan 2006 08.24.09
- Metroplan Orlando 2025 LRTP Executive Summary 08.24.09
- Volusia MPO 2025 LRTP Summary 08.24.09
- Economic Impact of TOD by Stations 08.24.09
- Construction and O&M Economic Analyses 08.24.09
- TOD Sketchbook 08.24.09
- JRTC Presentation 08.24.09
- Contract for Sale and Purchase
- Contract for Sale and Purchase_5th Amendment_Executed 11.03.11
- Contract for Sale and Purchase_4th Amendment_Executed 06.01.11
- Contract for Sale and Purchase_3rd Amendment_Executed 12.20.10
- Contract for Sale and Purchase_2nd Amendment_Executed 03.29.10
- Contract for Sale and Purchase_Corrective Amendment_Executed 01.04.08
- Bill of Sale_11.03.11
- Second SEA with Second Finding of No Significant Impact 09.10.10
- 2nd SEA -- Appendix A Station Plans 09.10.10
- 2nd SEA -- Appendix B CSER 09.10.10
- 2nd SEA -- Appendix C Cultural and Historic Resources 09.10.10
- 2nd SEA -- Appendix D Ecosystems 09.10.10
- 2nd SEA -- Appendix E Wetlands 09.10.10
- 2nd SEA -- Appendix F Impacts and Relocations 09.10.10
- 2nd SEA -- Appendix G Noise and Vibration Technical Report 09.10.10
- Public Hearing Agenda 05.25.10
- Public Hearing hand-out 05.25.10
- Public Hearing Presentation 05.25.10
- Addendum to FONSI 7-22-08 (758.80 KB) 07.23.08
- Attachments to FONSI Addendum 7.22.08
- CFCRT SEA FONSI Exec. Summary & Table of Contents 07.23.08
- CFCRT SEA FONSI Chap. 1 07.23.08
- CFCRT SEA FONSI Chap. 2 07.23.08
- CFCRT SEA FONSI Chap. 3 07.23.08
- CFCRT SEA FONSI Chap. 4 07.23.08
- CFCRT SEA FONSI Chap. 5 07.23.08
- CFCRT SEA FONSI Chap. 6 07.23.08
- CFCRT SEA FONSI Chap. 7 07.23.08
- CFCRT SEA FONSI Appx. A - Station Site Plans 07.23.08
- CFCRT SEA FONSI Appx. B1 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B2 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B3 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B4 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B5 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B6 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B7 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. B8 - Contamination Screening Evaluation Reports 07.23.08
- CFCRT SEA FONSI Appx. C - Cultural and Historic Resources 07.23.08
- CFCRT SEA FONSI Appx. D - Parcel Relocation & Easements Table 07.23.08
- CFCRT SEA FONSI Appx. E - Train Counts 07.23.08
- CFCRT SEA FONSI Appx. F1 - Noise Contour Maps 07.23.08
- CFCRT SEA FONSI Appx. F2 - Noise Contour Maps 07.23.08
- CFCRT SEA FONSI Appx. F3 - Noise Contour Maps 07.23.08
- CFCRT SEA FONSI Appx. F4 - Noise Contour Maps 07.23.08
- CFCRT SEA FONSI Appx. F5 - Noise Contour Maps 07.23.08
- Final S-Line Grade Crossing Report 07.23.08
- Final S-Line Noise and Vibration Technical Report 07.23.08
- Addendum to ESBA 07.17.08
- Supplemental EA Public Hearing presentation 06.13.08
- Supplemental EA Public Hearing and Workshop Notices 05.20.08
- Public Hearings Presentation 01.16.07
- Public Hearing Brochure / Direct Mail Announcement 12.21.06
- Public Hearing Media Advisory 12.21.06
- CFCRT EA/FONSI 04.27.07
- Abstract and Preface 03.17.07
- Executive Summary 03.01.07
- Table of Contents 03.01.07
- Chapter 1 Purpose and Need 03.01.07
- Chapter 2 Alternatives 03.01.07
- Chapter 3 Environmental Consequences 03.01.07
- Chapter 4 Transportation Impacts 03.01.07
- Chapter 5 Eval. of Alternatives 03.01.07
- Chapter 6 Comments, Consult. and Coordination 03.01.07
- Appendix A List of Preparers 03.01.07
- Appendix B Land Use and Com. Cohesion Maps 03.01.07
- Appendix C List of EA Recipients 03.01.07
- Appendix D List of Technical Reports 03.01.07
- Appendix E Agency Correspondence 03.01.07
- Appendix F Glossary 03.01.07
- Appendix G List of Abbreviations and Acronyms 03.01.07
- Appendix H Advance Notification 03.01.07
- Appendix I Utility Contact Information 03.01.07
- Appendix J FDOT-CSX M.O.U. 03.01.07
- Appendix K Conceptual Drawings Plans and Profiles 03.01.07
- Appendix K Conceptual Drawings Station Concepts 03.01.07
- Appendix K Conceptual Drawings Cross Sections 03.01.07
- Appendix L Impacted Parcels 03.01.07
- Appendix M Noise Impacts Location Maps 03.01.07

